Group 14 DAVIS/UNION

Project Progress

Davis

Aug 2024

Davis Rental Apartments, marketed as the "Terra" apartment, has the following construction progress as of mid-August:

  • The exterior wall construction has been completed, the roofing has been finished, the floor mat and outdoor furniture on the 18th floor public terrace have been installed. 

  • Solar panels and outside AC units have been installed on the rooftop.

  • The construction and decoration of the apartment lobby is substantially completed. 

  • Amazon Hub Locker installation is pending delivery.

  • The two resident elevators have already been installed. All corridors have been substantially constructed. Resident apartments are in the final stages of construction.

  • Utilities are in the process of being connected for each residential units.

  • The construction of amenities has been substantially completed, some equipment and furniture have been put in, waiting for the final assembly and commissioning work;

  • The ground floor retail space will be occupied by a restaurant; the leasing progress of the apartments is going smoothly. It is expected to obtain the first batch of TCO this fall, welcoming the first group of tenants to move in.

May 2024

Window installation and exterior is almost complete.

​

The interior construction is progressing on time.

​

Sales gallery is ready.

​

Electrical, water, pipe and AC units have been installed.​

Nov 2023

Topped out, expected completion Quarter 1 of 2025

Sep 2023

Construction build out progressing; with projected completion by mid 2024