Prime Condo
Dec 2020
The project has been almost completed. TCO is expected to approve in March/April 2021.
Nov 2019
The contruction has made rapid progress. The foundation and superstructure work has been completed. The water and elcectric work, and HVAC has been completed to the roof. The punched doors/windows have been installed to the top floor. Elevators are being installed with the framing has been completed. The drive walls have been completed to the 8th floor. The project is estimated to be complete by the fall next year.
Aug 2019
The contruction has made rapid progress. The foundation and superstructure work has been completed. The water and elcectric work has been completed up to the 9th floor and the 8th floor, respectively. HVAC has been completed up to the 7th floor. Elevators are being installed with the framing has been completed. The drive walls have been completed in the first few floors. The project is estimated to be complete by mid next year.
May 2019
The contruction has made rapid progress. The foundation and superstructure work has been completed. The water and elcectric work has been completed up to the 6th floor. Doors and windows are delivered to the site for several floors.
Jan 2019
The contruction has made rapid progress. The foundation work has been completed. The superstructure has been up to the third floor. The building is expected to be topped out in 2.5 months.